Why markup materials




















Thank you Russell Gronsky. Andi Mysza. It all depends of the cost of the project, type of materials standard vs customized , type of project, location, availability of contractors, etc.

Get at least three quotes from different contractors with somewhat good comparable credentials if possible. Other thing you can do, request two quotes for each contractor, one with materials included and other quote for just labor and equipment. That way you are encouraging them to give you a fair markup price for the materials.

You can do what you like but unless you are set up like a contractor you should let your contractor buy his own. The reasons are simple. He is responsible for the materials on that job. It is up to him to contact the manufacture to make it right if something goes wrong. Spend your time doing what you are good at and let him do the same.

Ones that charge this are not savvy on their business. Not usually though. You may be paying more or less than you need to be. You or they will never really know.

You should pay a line item of everything included in your job. IE, permits, office personnel, fuel, rentals, overhead as pertains to your job only , etc Lock We hate spam just as much as you.

If you signed up for BiggerPockets via Facebook, you can log in with just one click! Log in with Facebook. Full Name Use your real name. Password Use at least 8 characters. Using a phrase of random words like: paper Dog team blue is secure and easy to remember.

All All. Menu Menu. Recommended Vendors. Real Estate Books. Based outside Atlanta, Ga. Beginning her career at newspapers such as the "Marietta Daily Journal" and the "Atlanta Business Chronicle," she most recently worked in communications and management for several nonprofit organizations before purchasing a flower shop in By Shala Munroe.

Project Management Contract Types. Break-Even Point Before you decide on how much to mark up your materials, know how much you need to make on the job to break even. Markup vs. Margin Markup and your profit margin are calculated differently. Parts Markup A standard markup in a non-retail business is percent, meaning you charge the customer twice what you spent on the part or material.

Overall Markup Instead of setting a percentage to mark up your materials, provide overall job estimates. Related Articles. There is no preset national standard for markup on materials. This article provides guidance to the contractor, estimator or project manager with setting the markup rates on materials. Setting the proper rate requires the management team understand that materials exist in a spectrum of condition, from simple raw materials status to highly complex and intricate status such as technology.

The materials position along this spectrum greatly affects the markup formula. In addition to understanding the materials condition; other factors affect markup such as availability, delivery, condition, security and compliance. All of these issues impact the markup formula with materials.

To assist the reader in understanding markup on materials, the first section below is a summary understanding of what and why markup with construction is performed.

Markup in the construction industry is different for each contractor. There is a plethora of contributing factors adding costs to conduct business. In general, there are three types of costs for a contractor. The first and the most expensive is direct costs of construction.

These are the materials, labor, subcontracting, equipment and other direct costs to build the structure and complete the project.

Markup with construction is calculated on direct costs of construction to cover the other two cost groups and provide a profit. The other three are as follows along with some examples:.

The standard formula for markup is as follows:. Materials is just one of the many direct costs of construction. The key is to understand the underlying conditions associated with the respective materials.

Material status refers to its position along the spectrum of condition. Materials can be in the form of raw status such as fill, sand or stone; or it can assume the next position along the spectrum and be processed. Thus, stone can be processed into crushed stone and therefore moves towards a higher state of condition.

The following is the materials spectrum of condition, from lowest to the most sophisticated, and some examples associated with that condition:. As the materials move from the lowest to the more sophisticated status, outside labor and businesses add value taking the particular material to the next level.

For example, pipes are made from raw materials but have some engineered work done prior to ensure integrity and quality manufacturing of the pipe. The same goes for wire, it is a composite of metal, paper, synthetic membrane and wrapped on the outside by a polyurethane coating to protect it from rubbing and cuts.

A manufacturer took the raws materials and developed a process to produce wire. Each step up in sophistication means that another business added value and therefore had to make profit in order to cover their respective indirect, overhead and desired profit. Thus, as the materials used on a job are more sophisticated the less working room for markup exists for the final step. Whereas with less sophisticated materials, there is more room to work with markup percentages.

There is more to the materials cost than the actual core amount paid for the material. The most common factor affecting the total price of materials is delivery fees. Delivery costs range from free to custom delivery systems including the use of cranes or even heavy lift helicopters to place the material in the right spot.